Page 59 - All Scale Rails Magazine Issue 3 July August 2015
P. 59

www.AllScaleRails.com






























         View 35                                                     Ice House







        factory in the corner shared by the ice house is         is left over from a Kibri kit.  The goal posts at
        another plastic kit from Kibri.                          the ends of the football/soccer field are made
             The water off of the ferry dock is Magic            from brass rod, soldered and painted.  Like
        Water (Unreal Details) brand.  Before pouring            the main module, the trees used were from
        the ‘water’, Kevin painted the bottom of the             Architrees, although on the end modules he
        indented area of the layout with a dark blue             made some of his own with flocking, scenic
        Testors enamel paint and glued the piles to the          cement and the plant Sedum.
        base.  He poured in about 95% of the water.                   The school buses on the factory module
        He then took a toothpick and dripped a few               and the trucks on the ferry dock module are
        drops of paint onto the wet water.  Taking a             all Randy Brown (AMS) resin kits glued to-
        toothpick, Kevin slowly and gently swirled the           gether and painted.  All the plastic cars are
        paint into the water.  This gave the water a             Märklin brand plastic kits.  There is a street
        deeper, murkier look.  After it dried, he mixed          sweeper on the bridge on the factory module
        up another batch and topped off the remainder            that was a kit by La-Z-Way-Out.
        of the cured water.  The ballast, grass, ground               On the ferry dock module, Kevin has hung
        cover and dye used are all the same as on the            a 12” X 16” wood case similar to the one on
        other layouts so that the look of the layouts is         the main module that hangs from two eye
        seamless when they are put together.                     hooks on the back of the module.  On the out-
             Most of the fences were made by ribbon              side of wood box, he used colored paint
        spray painted silver and held up by brass rods           markers to outline where each track runs; if it
        that had been soldered, cut and put into place.          is a mainline or siding and where his blocks
        The back stop on the baseball diamond was                are.  Small holes were drilled into the wood
        also made in the same manner.  The bit of                box where switches are located on the layout
        black plastic fencing on the large end module            and toggle switches were placed in the holes.





                Issue #  3                      2015                                                           59
   54   55   56   57   58   59   60   61   62   63   64