Page 57 - All Scale Rails Magazine Issue 3 July August 2015
P. 57
www.AllScaleRails.com
Overhead View of Ferry Dock Module
There is a Kibri building with a tall smoke Pennzee (made by Micro Art) products. The
stack attached to the same building complex. roof accessories are leftovers from a plastic
The mustard colored factory is also part of the Kibri kit.
same grouping of buildings, although this one There is a conveyor that runs from one
is not attached. This building has tall win- building to the other on this particular com-
dows and is manufactured by Time Cast. The plex that was crafted from a rectangular piece
shed with the loading platform and the gray of balsa wrapped in styrene. The braces for
factory on the same asphalt parking lot are all the conveyor were made from pieces of balsa
resin buildings by Time Cast. as well. This complex is based on the Froed-
There is a tall elevator and silos in the cen- ert Malt Corporation of Milwaukee, Wiscon-
ter of the ferry dock module that are complete- sin (now Malteurop North America, Inc.)
ly scratch built using wood dowels for the The giant “D” was strategically placed on the
silos and rectangular pieces of balsa glued to- top to represent the first letter of our last
gether for the elevator. Before they were name. In reality, there is a giant “F” for
painted, Kevin glued them together using Froedert adorning the top. A Jolly Rogers
wood glue and CA (cyanoacrylate) glue to fill flag flies at the top of this building as this
in any gaps. The windows and doors are brass building was placed on the layout as an un-
Issue # 3 2015 57

