Page 56 - All Scale Rails Magazine Issue 3 July August 2015
P. 56
www.AllScaleRails.com
Ferry Dock Module
The buildings on the larger end module are were extensively modified. The buildings
all industrial. The elevator/silo complex near- were elevated and doors were ground out.
est to the main module is from Microfigs. The The service doors were replaced with Pen-
shorter factory with an abundance of windows nzee’s (made by Micro Art) brass doors and
is by Time Cast. Kevin decided to use two of the loading doors replaced with styrene sheet
the same factories and lay them end to end to metal.
create on large factory complex. These kits
View 29
View 30 Froedert Malt Corporation
56 All Scale Rails

