Page 50 - All Scale Rails Magazine Issue 13 March April 2017
P. 50
www.AllScaleRails.com
On the east end of the depot, between the
two large rooms is a bathroom that pulls dou-
ble duty as part of a tunnel for the trains to
pass from one room to the other. Two lines
enter from the very far corner, one from a
long tunnel connected from near Centerville,
hidden under the scenery until it emerges
through the wall, the other coming from
County Line along the far back wall, both
through wooden tunnel portals.
View 118 Functional Bridge in
Another added “perk” of the club’s loca- Bathroom Wash Area
tion is the sporadic rumbling as trains pass
Maps are not done to scale - they are to
over the still active lines above Allis Station.
help locate the photos on the layout.
Our next issue will feature the second half
Magazine Cover Photo is View 120
of this historic layout, the expansion that took
From the map of:
over the baggage room…and beyond! *
Model Railroad Club of Milwaukee’s
“Milwaukee Union Terminal Railroad” &
“Milwaukee Electric Lines”
O Scale Layout Part 2
Club Secretary’s Email:
3georgediane@gmail.com
View 119
50 All Scale Rails

